Muyang Steel Structure Plan

Muyang will create printed files of all inquiries and project data received under the name of the submitting company for evaluation or execution of the project. All information is considered confidential at all times and may not be shared or released for any reason without the consent of the client. In the case that Muyang will share or outsource production, the client must first approve the sharing of information. Furthermore, Muyang will not reveal specific information about other Muyang customers, their locations or projects unless this release of information has been previously approved by that client. All customers have a right to privacy and Muyang will comply with all NDA requests.


Every project inquiry is reviewed by Muyang engineers, production management, and senior management to ensure that your steel structure engineering and your company are a good match for cooperation. Confirmed projects will be sent to estimating. Muyang favors steel fabrication projects in the range of 100~1000kg/m, such as petrochemical plants, refineries, boiler structures, power plants, light and heavy industrial projects. We are also able to structural steel fabrication and secondary steel structures. Other aspects of the client are considered, such as client type, business type, location, scope of supply, schedule, delivery terms, payment terms, and ease of cooperation. It is always our opinion that the relationship comes before the project, so we do our best to make good choices during this stage.

Muyang Steel Structure Inspection and Test Plans include:
1. Purchase Order Number
2. Material / Equipment description
3. Legend
4. Applicable activities occurring during the fabrication / assembly
5. Control Procedures
6. Acceptance Criteria (Project Specification, Code reference, or both)
7. Verifying Document (Document that is generated after the activity is completed)
8. Vendors participation for each listed activity (Show which department or sub-vendor is responsible).
9. Purchaser / Client Participation (if applicable)
10. Establish and show holding points for quality controls. These activities depend on the vendor / supplier sledged)
11. NDT/NDE Requirements.