This mixing machine should be fixed on a flat concrete base floor or a steel frame with enough strength by fixing onto the floor with foundation bolts. Or else, it will result in severe vibration or accident. Please refer to Table 4-1 for the tightening torque of the foundation bolts. Any accident caused by unsetting machine is out of Muyang's responsibility. A matched surge bin should be configured under the machine; a matched feeding device should be configured on the upper part of the machine. Adjust the rotating direction of the rotor to make it in accordance with that pointed by the arrow on the machine housing.


If a liquid application device is optioned, connect the liquid pipelines and the compressed air pipelines. Schematic diagram is for the connecting of liquid application system. If an air-sac blowing device is adopted, connecting to the electric power supply and air supply as per that shown in Fig.4-4 Schematic diagram for the connecting of air-sac blowing device. If a pneumatic cylinder of the mixing machinery is used to control the opening/closing of the door, connect it to the air source with a Φ12 plastics pipe according to Fig.4-5 Schematic diagram for connecting to air source. The upper end of air-return duct should be connected to the surge bin or somewhere above the scale so as to ensure stably feeding.
No comments:
Post a Comment